Call for an Installation Quote
(07) 3710 8212
We are hiring - Join Queensland's Leading Generator Company

Shop

KV650C2, 50 Hz – Industrial Diesel Generator Set

There are more reasons than we can count to invest in this generator but the most important one is that it was manufactured by Kohler. Power generation solutions manufactured by Kohler are made using cutting-edge innovation and modern and fully certified laboratories. This is why Reactive Generators is an authorized Kohler generator supplier. We’re happy to advocate for their premium accessories, components and configurations. They offer our clients individualized power generation capability and can even simplify the process of maintenance and upkeep. One exceptional feature of this Genset brand is its wide controller range that gives industrial property owners and managers an easy way to manage their investments. Kohler controllers provide the reliability and performance you will begin to expect from the brand. You will have the easier capability to program, manage, and diagnose issues in an efficient way

SKU: KV650C2 Categories: , , ,

Description

Other Benefits
  • Premium level engines, in-house or from strong partners
  • High power density but with a small carbon footprint
  • Low temperature starting capability
  • Long maintenance intervals
  • Provide industry-leading motor starting capability
Generator Specifications
  • Engine brand – VOLVO
  • Alternator commercial brand – KOHLER
  • Voltage (V) 400/230
  • Standard Control Panel – APM403, APM802, M80, Terminal block
  • Consumption @ 100% load ESP (L/h) 130.3
  • Consumption @ 100% PRP load (L/h) 116.7
  • Type of Cooling – Mechanical driven fan
  • Performance class – G3
  • Number of cylinders – 6
KOHLER STANDARD GENERATOR WARRANTY
For Products in “backup” service

  • 30 months from the date the product leaves the plant
  • 24 months from the Product’s commissioning date
  • 1,000 running hours

For Products in “prime” or “continuous” service

  • 18 months from the date the product leaves the plant
  • 12 months from the Product’s commissioning date
  • 2,500 running hours